Official record

Immediate Measures To Increase American Mineral Production

Record date: 2025-03-25

( printed page 13673) Executive Order 14241 of March 20, 2025 Immediate Measures To Increase American Mineral Production By the authority vested in me as President by the Constitution and the laws of the United States of America, including section 301 of title 3, United States Code , it is hereby ordered: Section 1 . Purpose. The United States possesses vast mineral resources that can create jobs, fuel prosperity, and significantly reduce our reliance on foreign nations. Transportation, infrastructure, defense capabilities, and the next generation of technology rely upon a

What this record contains

Federal Register document
2025-05212
Publication date
2025-03-25
Citation
90 FR 13673
Issuing office
Executive Office of the President

Official record excerpt

( printed page 13673) Executive Order 14241 of March 20, 2025 Immediate Measures To Increase American Mineral Production By the authority vested in me as President by the Constitution and the laws of the United States of America, including section 301 of title 3, United States Code , it is hereby ordered: Section 1 . Purpose. The United States possesses vast mineral resources that can create jobs, fuel prosperity, and significantly reduce our reliance on foreign nations. Transportation, infrastructure, defense capabilities, and the next generation of technology rely upon a secure, predictable, and affordable supply of minerals. The United States was once the world's largest producer of lucrative minerals, but overbearing Federal regulation has eroded our Nation's mineral production. Our national and economic security are now acutely threatened by our reliance upon hostile foreign powers' mineral production. It is imperative for our national security that the United States take immediate action to facilitate domestic mineral production to the maximum possible extent. Sec. 2 . Definitions. For the purposes of this order: (a) “Mineral” means a critical mineral, as defined by 30 U.S.C. 1606(a)(3) , as well as uranium, copper, potash, gold, and any other element, compound or material as determined by the Chair of the National Energy Dominance Council (NEDC). (b) “Mineral production” means the mining, processing, refining, and smelting of minerals, and the production of processed critical minerals and other derivative products. (c) The term “processed minerals” refers to minerals that have undergone the activities that occur after mineral ore is extracted from a mine up through its conversion into a metal, metal powder, or a master alloy. These activities specifically occur beginning from the point at which ores are converted into oxide concentrates, separated into oxides, and converted into metals, metal powders, and master alloys. (d) The term “derivative products” includes all goods that incorporate processed minerals as inputs. These goods include semi-finished goods (such as semiconductor wafers, anodes, and cathodes) as well as final products (such as permanent magnets, motors, electric vehicles, batteries, smartphones, microprocessors, radar systems, wind turbines and their components, and advanced optical devices). Sec. 3 . Priority Projects . (a) Within 10 days of the date of this order, the head of each executive department and agency (agency) involved in the permitting of mineral production in the United States shall provide to the Chair of the NEDC a list of all mineral production projects for which a plan of operations, a permit application, or other application for approval has been submitted to such agency. Within 10 days of the submission of such lists, the head of each such agency shall, in coordination with the Chair of the NEDC, identify priority projects that can be immediately approved or for which permits can be immediately issued, and take all necessary or appropriate actions within the agency's authority to expedite and issue the relevant permits or approvals. (b) Within 15 days of the date of this order, the Chair of the NEDC, in consultation with the heads of relevant agencies, shall submit to the ( printed page 13674) Executive Director of the Permitting Council mineral production projects to be considered as transparency projects on the Permitting Dashboard established under section 41003 of title 41 of the Fixing America's Surface Transportation Act, Public Law 114-94 , 129 Stat. 1748. Within 15 days of receiving the submission, the Executive Director shall publish any projects selected and establish schedules for expedited review. (c) The Chair of the NEDC, in consultation with relevant agencies, shall issue a request for information to solicit industry feedback on regulatory bottlenecks and other recommended strategies for expediting domestic mineral production. Sec. 4 . Mining Act of 1872. Within 30 days of the date of this order, the Chair of the NEDC and the Director of the Office of Legislative Affairs shall jointly prepare and submit recommendations to the President for the Congress to clarify the treatment of waste rock, tailings, and mine waste disposal under the Mining Act of 1872. Sec. 5 . Land Use for Mineral Projects. (a) Within 10 days of the date of this order, the Secretary of the Interior shall identify and provide the Assistant to the President for Economic Policy

The excerpt is reproduced from the public federal record and may omit later sections, tables, signatures or attachments. Open the official source for the complete text.

Questions for accountability

How to use this page

This is a source-record entry, not a truth-rating by itself. It preserves the action, date and original government publication so it can be connected to later claims, implementation records, court decisions, costs and measurable outcomes. Editorial claim reviews on this site use separate finding labels and explain the evidence for those findings.

Open primary source ↗