Official record

Authorizing Green Corridors, LLC, To Construct, Maintain, and Operate a Commercial Elevated Guideway Border Crossing Near Laredo, Texas, at the International Boundary Between the United States and Mexico

Record date: 2025-06-18

Presidential Permit of June 9, 2025 Authorizing Green Corridors, LLC, To Construct, Maintain, and Operate a Commercial Elevated Guideway Border Crossing Near Laredo, Texas, at the International Boundary Between the United States and Mexico By virtue of the authority vested in me as President of the United States of America (the “President”), I hereby grant permission, subject to the conditions set forth herein, to Green Corridors, LLC (the “permittee”), to construct, maintain, and operate a commercial elevated guideway crossing located on the United States border with Mexico in Laredo, Texas,

What this record contains

Federal Register document
2025-11354
Publication date
2025-06-18
Citation
90 FR 26171
Issuing office
Executive Office of the President

Official record excerpt

Presidential Permit of June 9, 2025 Authorizing Green Corridors, LLC, To Construct, Maintain, and Operate a Commercial Elevated Guideway Border Crossing Near Laredo, Texas, at the International Boundary Between the United States and Mexico By virtue of the authority vested in me as President of the United States of America (the “President”), I hereby grant permission, subject to the conditions set forth herein, to Green Corridors, LLC (the “permittee”), to construct, maintain, and operate a commercial elevated guideway crossing located on the United States border with Mexico in Laredo, Texas, as described in the “Presidential Permit Application: Green Corridors Intelligent Freight Transportation System” dated October 3, 2024, by the permittee to the Secretary of State and made complete with additional information provided by the permittee on February 14, 2025 (collectively, the “Application”), in accordance with 33 U.S.C. 535d and associated procedures. The term “Border facilities” as used in this permit consists of the elevated guideway and bridge over the Rio Grande which connects inland terminals near Monterrey, Mexico, in the state of Nuevo Leon and near Interstate 35, north of Laredo, Texas, its approaches, and any land, structures, installations, or equipment appurtenant thereto located on the United States side of the international boundary between the United States and Mexico, located just downstream from the Laredo-Colombia Solidarity International Bridge at the connection between Texas State Highway 255 and the Nuevo Leon State Highway Spur 1. This permit is subject to the following conditions: Article 1 . The Border facilities herein described and all aspects of their operation are subject to all the conditions, provisions, and requirements of this permit and any subsequent Presidential amendment to it. The construction, maintenance, and operation of the Border facilities shall be in all material respects as described in the Application. Article 2 . The standards for and the manner of construction, maintenance, and operation of the Border facilities are subject to inspection by the representatives of appropriate Federal, State, and local agencies. The permittee shall grant officers and employees of such agencies that are duly authorized and performing their official duties free and unrestricted access to said Border facilities. Article 3 . The permittee shall comply with all applicable Federal laws and regulations regarding the construction, maintenance, and operation of the Border facilities. Article 4 . (1) The permittee shall take or cause to be taken all appropriate measures to mitigate adverse impacts on or disruption of the human environment in connection with the construction, maintenance, and operation of the Border facilities. Mitigation measures are those that avoid, minimize, or compensate for adverse impacts. (2) The permittee shall hold harmless and indemnify the United States for any claimed or adjudged liability arising out of construction, maintenance, and operation of the Border facilities, including environmental contamination from the release, threatened release, or discharge of hazardous substances or hazardous waste. ( printed page 26172) (3) The permittee is responsible for obtaining any required Federal, State, and local permits, approvals, and authorizations prior to commencing construction activities. The permittee shall implement the mitigation identified in any environmental decision documents prepared in accordance with the National Environmental Policy Act and Federal permits, including stormwater permits and permits issued in accordance with section 402 of the Clean Water Act ( 33 U.S.C. 1342 ). The permittee shall comply with applicable Federal, State, and local environmental laws. Article 5 . The permittee shall immediately notify the President or his designee of any decision to transfer custody and control of the Border facilities or any part thereof to any executive department or agency (agency) of the United States Government. Said notice shall identify the transferee agency and seek the approval of the President for the transfer of the permit. In the event of approval by the President of such transfer, this permit shall remain in force and effect, and the Border facilities shall be subject to all the conditions, permissions, and requirements of this permit and any amendments thereof. The permittee may transfer ownership or control of the Border facilities to a non-Federal entity or individual only upon the prior express approval of such transfer by the President, which approval may include such conditions, permissions, and requirements that the President, in the

The excerpt is reproduced from the public federal record and may omit later sections, tables, signatures or attachments. Open the official source for the complete text.

Questions for accountability

How to use this page

This is a source-record entry, not a truth-rating by itself. It preserves the action, date and original government publication so it can be connected to later claims, implementation records, court decisions, costs and measurable outcomes. Editorial claim reviews on this site use separate finding labels and explain the evidence for those findings.

Open primary source ↗