Official record

Construction of the Dakota Access Pipeline

Record date: 2017-02-17

Memorandum of January 24, 2017 Construction of the Dakota Access Pipeline Memorandum for the Secretary of the Army [ Editorial Note: Memorandum of January 24, 2017 entitled Construction of the Dakota Access Pipeline, Memorandum for the Secretary of the Army, Document Number 2017-02032, was originally published on pages 8661 and 8662 in the Federal Register of Monday, January 30, 2017. Due to a discrepancy between the document the President signed and the electronic file used for publication, we are republishing the signed document here, in its entirety.] Section 1 .

What this record contains

Federal Register document
R1-2017-02032
Publication date
2017-02-17
Citation
82 FR 11129
Issuing office
Executive Office of the President

Official record excerpt

Memorandum of January 24, 2017 Construction of the Dakota Access Pipeline Memorandum for the Secretary of the Army [ Editorial Note: Memorandum of January 24, 2017 entitled Construction of the Dakota Access Pipeline, Memorandum for the Secretary of the Army, Document Number 2017-02032, was originally published on pages 8661 and 8662 in the Federal Register of Monday, January 30, 2017. Due to a discrepancy between the document the President signed and the electronic file used for publication, we are republishing the signed document here, in its entirety.] Section 1 . Policy. The Dakota Access Pipeline (DAPL) under development by Dakota Access, LLC, represents a substantial, multi-billion-dollar private investment in our Nation's energy infrastructure. This approximately 1,100-mile pipeline is designed to carry approximately 500,000 barrels per day of crude oil from the Bakken and Three Forks oil production areas in North Dakota to oil markets in the United States. At this time, the DAPL is more than 90 percent complete across its entire route. Only a limited portion remains to be constructed. I believe that construction and operation of lawfully permitted pipeline infrastructure serve the national interest. Accordingly, pursuant to the authority vested in me as President by the Constitution and the laws of the United States of America, I hereby direct as follows: Sec. 2 . Directives. (a) Pipeline Approval Review. The Secretary of the Army shall instruct the Assistant Secretary of the Army for Civil Works and the U.S. Army Corps of Engineers (USACE), including the Commanding General and Chief of Engineers, to take all actions necessary and appropriate to: (i) review and approve in an expedited manner, to the extent permitted by law and as warranted, and with such conditions as are necessary or appropriate, requests for approvals to construct and operate the DAPL, including easements or rights-of-way to cross Federal areas under section 28 of the Mineral Leasing Act, as amended, 30 U.S.C. 185 ; permits or approvals under section 404 of the Clean Water Act, 33 U.S.C. 1344 ; permits or approvals under section 14 of the Rivers and Harbors Act, 33 U.S.C. 408 ; and such other Federal approvals as may be necessary; (ii) consider, to the extent permitted by law and as warranted, whether to rescind or modify the memorandum by the Assistant Secretary of the Army for Civil Works dated December 4, 2016 (Proposed Dakota Access Pipeline Crossing at Lake Oahe, North Dakota), and whether to withdraw the Notice of Intent to Prepare an Environmental Impact Statement in Connection with Dakota Access, LLC's Request for an Easement to Cross Lake Oahe, North Dakota, dated January 18, 2017, and published at 82 Fed. Reg. 5543; (iii) consider, to the extent permitted by law and as warranted, prior reviews and determinations, including the Environmental Assessment issued in July of 2016 for the DAPL, as satisfying all applicable requirements of the National Environmental Policy Act, as amended, 42 U.S.C. 4321 et seq., and any other provision of law that requires executive agency ( printed page 11130) consultation or review (including the consultation or review required under section 7(a) of the Endangered Species Act of 1973, 16 U.S.C. 1536(a) ); (iv) review and grant, to the extent permitted by law and as warranted, requests for waivers of notice periods arising from or related to USACE real estate policies and regulations; and (v) issue, to the extent permitted by law and as warranted, any approved easements or rights-of-way immediately after notice is provided to the Congress pursuant to section 28(w) of the Mineral Leasing Act, as amended, 30 U.S.C. 185(w) . (b) Publication. The Secretary of the Army shall promptly provide a copy of this memorandum to the Speaker of the House of Representatives, the President pro tempore of the Senate, the Majority Leader of the Senate, and the Governors of each State located along the Dakota Access Pipeline route. The Secretary of the Army is authorized and directed to publish this memorandum in the Federal Register. (c) Private Property. Nothing in this memorandum alters any Federal, State, or local process or condition in effect on the date of this memorandum that is necessary to secure access from an owner of private property to construct the pipeline and

The excerpt is reproduced from the public federal record and may omit later sections, tables, signatures or attachments. Open the official source for the complete text.

Questions for accountability

How to use this page

This is a source-record entry, not a truth-rating by itself. It preserves the action, date and original government publication so it can be connected to later claims, implementation records, court decisions, costs and measurable outcomes. Editorial claim reviews on this site use separate finding labels and explain the evidence for those findings.

Open primary source ↗